The instructor

Taught by someone who has done the job

Not a consultant. Not an academic. A practitioner who has spent more than 40 years in manufacturing — and knows what breaks down on the floor.

Dave Luckner

Your instructor

Dave Luckner

Production Improvement Advisor · Scheduling Specialist

Dave Luckner has spent more than 40 years in manufacturing, the last three decades helping manufacturers get control of production planning and scheduling. He started on the engineering side as a manufacturing engineer and CAD system manager at Summagraphics, then worked with plants of all sizes through roles at Lilly Software, Infor, Sypris Electronics, Epicor, and LillyWorks.

Since 2015 he has been a production improvement advisor to manufacturers, today through Production Priorities, and works as a scheduling specialist with just-plan-it and Planify, the Institute's sponsor. He has seen the same pattern in hundreds of shops: the schedule lives in one or two people's heads and a spreadsheet, and every day starts with the hot list. This class teaches the way out.

Background

Credentials and background

01

40+ years in manufacturing

Started on the engineering side as a manufacturing engineer and CAD system manager

02

Summagraphics

Manufacturing engineer and CAD system manager — hands-on plant floor experience from the start

03

Lilly Software, Infor, Epicor

Worked with plants of all sizes across leading manufacturing software and operations roles

04

Sypris Electronics & LillyWorks

Deep operational experience across electronics manufacturing and production planning systems

05

Production Priorities (2015–present)

Independent production improvement advisor helping manufacturers take control of their schedules

06

just-plan-it & Planify

Scheduling specialist with the Institute's sponsor — active practitioner, not a retired one

Approach

How Dave teaches

Every session is built around a real problem. You will not sit through slides about theory — you will work through the same scheduling challenges Dave has seen on actual shop floors, in a spreadsheet, alongside peers who are dealing with the same issues you are.

01

Problems first, concepts second — you learn the method by solving the problem, not by memorizing a framework

02

No software required — the spreadsheet is the tool, because that is what most shops actually use

03

Peer learning — the cohort format means you hear how other schedulers handle the same constraints you face

04

Direct access — Dave answers questions live during every session, not in a forum three days later

Learn from the source

Six sessions. Twenty seats. Reserve yours before the first cohort fills.

Production Scheduling Institute

Production Scheduling Fundamentals

© 2026 Production Scheduling Institute. All rights reserved.

First cohort starts January 13, 2027